General Information
Completion: | 1922 |
---|---|
Status: | out of service |
Project Type
Structure: |
Deck arch bridge |
---|---|
Material: |
Reinforced concrete bridge |
Function / usage: |
Road bridge |
Location
Location: |
Eketahuna, Manawatu-Wanganui, New Zealand |
---|---|
Coordinates: | 40° 42' 13.43" S 175° 39' 30.67" E |
Technical Information
Materials
deck |
reinforced concrete
|
---|---|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
- W. A. Falkner (designer)
- W. A. Millar (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 266. (2001):
- About this
data sheet - Structure-ID
20052112 - Published on:
16/01/2010 - Last updated on:
17/01/2019