General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Seoul, South Korea |
---|
Technical Information
Dimensions
main span | 160 m | |
total length | 2 x 1 070 m | |
horizontal radius of curvature | min. 500 m | |
deck | deck width | 2 x 19.3 m |
Quantities
prestressing steel | 1 285 t + 522 t |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Owner
Design
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Anyang-Dong Elevated Viaduct, Korea. In: VSL News, v. 6, n. 2 ( 1995), pp. 10. (1995):
- About this
data sheet - Structure-ID
20004125 - Published on:
04/07/2002 - Last updated on:
07/01/2017