0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1824
Completion: 1827
Status: in use

Project Type

Function / usage: Road bridge
Structure: Vaulted arch bridge
Material: Masonry bridge

Location

Location: , , ,
Crosses:
  • Annan River
Coordinates: 54° 59' 14.17" N    3° 15' 56.60" W
Show coordinates on a map

Technical Information

Cost

cost of construction ca. Pound sterling 6 000

Materials

arches stone

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20021595
  • Published on:
    16/05/2006
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine