General Information
Beginning of works: | 1997 |
---|---|
Status: | collapsed (2009) |
Project Type
Structure: |
Cable-stayed bridge |
---|---|
Function / usage: |
Road bridge |
Location
Technical Information
Dimensions
main span | 68 m | |
total length | 226 m |
Chronology
2000 | Work on the bridge is put on hold after UNESCO warns that the site's world heritage status would be threatened if the bridge were built. |
---|---|
October 2008 | Bridge construction resumes. Independent inspectors however found beforehand that the post-tensioning used for the cable-stays had rusted during the construction stoppage. At the exposed anchorages the wedges were also rusted so that the contractor was warned that construction could only go ahead if the cables were replaced and the deck structure propped up while doing so. |
January 2009 | The bridge deck collapses after a tower fails under uneven loading. |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Collapse halts construction of controversial Hampi bridge. In: Bridge Design & Engineering, v. 15, n. 54 (1st Quarter 2009), pp. 12.