0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1872
Completion: 26 July 1875
Duration of works: 30 months
Status: in use

Project Type

Function / usage: Hydraulic lift lock

Location

Location: , , , ,
Coordinates: 53° 16' 22" N    2° 31' 50" W
Show coordinates on a map

Technical Information

Dimensions

height difference 15.2 m

Cost

cost of construction Pound sterling 48 428

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20065378
  • Published on:
    24/06/2013
  • Last updated on:
    21/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine