0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 2009
Completion: December 2012
Status: in use

Project Type

Location

Location: , , ,
, ,
Crosses:
  • Missouri River
Next to: Atchison Rail Bridge (1901)
Replaces: Amelia Earhart Bridge (1939)
Coordinates: 39° 33' 33.89" N    95° 6' 49.12" W
Show coordinates on a map

Technical Information

Dimensions

main span 161 m
total length 760 m

Cost

cost of construction United States dollar 59 400 000

Materials

piers reinforced concrete
arches steel
abutments reinforced concrete

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20082207
  • Published on:
    29/01/2022
  • Last updated on:
    29/01/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine