General Information

Name in local language: Talbrücke Altenahr
Beginning of works: June 1989
Completion: May 1992
Duration of works: 36 months
Status: in use

Project Type

Location

Location: , , , ,
Address: B 257
Coordinates: 50° 30' 42.12" N    6° 58' 53.13" E
Show coordinates on a map

Technical Information

Dimensions

total length 318.35 m
span lengths 28.0 m - 36.0 m - 38.0 m - 4 x 45.0 m - 36.35 m
clearance 4.70 - 22 m
number of spans 8
bridge surface ca. 4 600 m²
deck deck width 14.00 m
piles diameter 1.50 m

Quantities

abutments concrete volume 588 m³
reinforcing steel 67 t
deck concrete volume 5 210 m³
reinforcing steel 420 t
transverse prestressing 22.6 t
longitudinal prestressing 169 t
foundations concrete volume 1 077 m³
reinforcing steel 59 t
piers concrete volume 673 m³
reinforcing steel 67 t
pile caps concrete volume 381 m³
reinforcing steel 24 t
piles reinforcing steel 11.3 t
total length of piles 134 m

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction German Mark 10 800 000

Materials

deck prestressed concrete
piers reinforced concrete
foundations reinforced concrete
piles reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001172
  • Published on:
    15/12/2000
  • Last updated on:
    07/12/2016