General Information
Other name(s): | Tunnel de l'Alouette |
---|---|
Completion: | 19th century |
Status: | in use |
Project Type
Construction method: |
Cut-and-cover method |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Structure: |
Tunnel |
Location
Location: |
Vierzon, Cher (18), Centre-Val de Loire, France Theillay, Loir-et-Cher (41), Centre-Val de Loire, France |
---|---|
Coordinates: | 47° 15' 46.28" N 2° 2' 27.02" E |
Coordinates: | 47° 16' 26.95" N 2° 2' 28.91" E |
Technical Information
Dimensions
length | 1 300 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20016291 - Published on:
14/05/2005 - Last updated on:
28/05/2021