General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Harmar, Allegheny County, Pennsylvania, USA Plum, Allegheny County, Pennsylvania, USA |
---|---|
Crosses: |
|
Replaces: |
Pennsylvania Turnpike Allegheny River Bridge (1951)
|
Coordinates: | 40° 32' 15.22" N 79° 49' 21.41" W |
Technical Information
Dimensions
main span | 159 m | |
total length | 720 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Construction engineers
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20038725 - Published on:
05/08/2008 - Last updated on:
28/09/2020