0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1999
Status: in use

Project Type

Structure: Tension leg platform (TLP)
Function / usage: Oil or gas platform

Location

Location: ,
Location description:

Green Canyon 254

Technical Information

Dimensions

water depth 1 006 m

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20005383
  • Published on:
    23/09/2002
  • Last updated on:
    22/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine