General Information
Completion: | 1965 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Essen, North Rhine-Westphalia, Germany |
---|---|
Coordinates: | 51° 27' 16" N 7° 0' 27" E |
Technical Information
Dimensions
deck depth | 1.0 m | |
total length | 134.0 m | |
span lengths | 2 x 18.0 m - 30.0 m - 25.0 m - 26.50 m - 16.5 m | |
number of spans | 6 | |
roadway / carriageway width | 8.0 - 12.0 m | |
walkway width | 3.0 m + 1.0 m |
Design Loads
live load | Brückenklasse 16 | |
design code(s) | DIN 1072 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Hochstraße am Waldthausenpark in Essen. In: Stahlbau, v. 34, n. 11 (November 1965), pp. 329-332. (1965):
- About this
data sheet - Structure-ID
20055196 - Published on:
14/03/2010 - Last updated on:
05/02/2016