0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: April 2010
Completion: September 2010
Status: in use

Project Type

Function / usage: Bicycle and pedestrian bridge
Structure: Through truss bridge
Material: Concrete bridge

Location

Location: , ,
Coordinates: 47° 8' 5.69" N    9° 50' 13.82" E
Show coordinates on a map

Technical Information

Dimensions

total length 35 m
truss height 4.20 m

Materials

truss reinforced concrete
deck slab reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066416
  • Published on:
    09/09/2014
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine