0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: July 2007
Status: in use

Project Type

Location

Location: , ,
Coordinates: 35° 1' 42.04" S    117° 53' 7.80" E
Show coordinates on a map

Technical Information

Dimensions

main span 36 m
total length 252 m
walkway width 2.34 m

Cost

cost of construction ca. Australian dollar 2 300 000

Materials

piers reinforced concrete
pylons steel
deck truss steel
deck slab reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072397
  • Published on:
    08/01/2017
  • Last updated on:
    07/03/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine