General Information
Status: | in use |
---|
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
T-section girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Iraq |
---|
Technical Information
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
precast prestressed concrete
|
Chronology
2003 | During the American invasion of Iraq, the bridge is partially destroyed and can no longer carry traffic. |
---|---|
July 2003 | A temporary bypass is built to accomodate for traffic. The bridge can then be repaired. |
3 March 2004 | Bridge is re-opened. |