0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2000
Completion: 2003
Status: in use

Project Type

Function / usage: Tramway line

Awards and Distinctions

2005 Award of Merit  

Location

km Name

Technical Information

Dimensions

total length 8.2 miles
number of stations 10

Cost

cost of construction United States dollar 1 900 000 000

Chronology

27 September 2002

A train derails during the load testing killing the driver.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10000106
  • Published on:
    02/07/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine