General Information
Status: | under construction |
---|
Project Type
Structure: |
Multi-span extradosed bridge |
---|---|
Material: |
Prestressed concrete bridge |
Construction method: |
Precast segmental construction |
Structure: |
deck: Single-cell box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Aguani, Bihar, India Sultanganj, Bihar, India |
---|---|
Crosses: |
|
Coordinates: | 25° 15' 36.23" N 86° 44' 33.19" E |
Technical Information
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
Chronology
April 2022 | The bridge collapses while under construction due to heavy rains and winds. |
---|---|
4 June 2023 | The extradosed bridge, stil under construction, collapses suddenly into thre river on a sunny day. |
Participants
Consulting engineers
Contractor
Relevant Web Sites
Relevant Publications
- (2018): Design of Multi-Span Extradose Bridges in India: Two Case Studies. Presented at: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, pp. S12-57.
- About this
data sheet - Structure-ID
20086024 - Published on:
05/06/2023 - Last updated on:
05/06/2023