0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Agripino Cawich Memorial Bridge

General Information

Other name(s): Young Bank Bridge
Beginning of works: 6 April 2004
Completion: 6 May 2005
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Belize River
Coordinates: 17° 16' 0.72" N    88° 48' 45.24" W
Show coordinates on a map

Technical Information

Dimensions

total length 114 m
deck width 9.14 m

Quantities

structural steel 235 t

Cost

cost of construction United States dollar 6 881 200.00

Materials

piers reinforced concrete
truss steel

Chronology

6 April 2004

Beginning of construction.

6 May 2005

Opened to traffic.

Participants

Structural engineering
Contractor
Steel construction

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20016936
  • Published on:
    21/07/2005
  • Last updated on:
    07/11/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine