General Information
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Balanced cantilever method |
Location
Location: |
Sogod, Southern Leyte, Philippines |
---|---|
Coordinates: | 10° 29' 46.39" N 124° 59' 52.68" E |
Technical Information
Dimensions
main span | 177 m | |
total length | 350 m | |
height above valley floor or water | 89 m | |
pier 1 | height | 73 m |
pier 2 | height | 75 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20052902 - Published on:
11/02/2010 - Last updated on:
12/01/2017