General Information
Project Type
Function / usage: |
Causeway (road) |
---|---|
Structure: |
Earth- and rockfill dam |
Location
Location: |
Den Oever, North Holland, Netherlands Harlingen, Friesland, Netherlands |
---|---|
Part of: | |
Coordinates: | 52° 56' 17.29" N 5° 2' 59.14" E |
Coordinates: | 53° 5' 34.77" N 5° 22' 37.17" E |
Technical Information
Dimensions
width | 90 m | |
height | 7.5 - 7. 8 m | |
length | 32 km | |
surface | 1 200 000 m² |
Quantities
clay volume | 13 500 000 m³ | |
sand volume | 23 000 000 m³ | |
number of rocks | 1 500 000 |
Cost
cost of construction | Dutch guilder 120 000 000 |
Materials
dam structure |
clay
rock sand |
---|
Participants
Design
- Cornelis Lely (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2021): Afsluitdijk climate resilient with XblocPlus. Presented at: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, pp. 256-264.
- About this
data sheet - Structure-ID
20012993 - Published on:
24/08/2004 - Last updated on:
27/08/2015