General Information
Project Type
Structure: |
Rigid frame bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Support conditions: |
for registered users |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Reinforced concrete bridge |
Location
Location: |
Unna, Unna (Kreis), North Rhine-Westphalia, Germany |
---|---|
Address: | Unna; Afferder Weg |
Part of: |
|
Supports: |
A 1 Motorway (Germany)
|
Coordinates: | 51° 33' 3.81" N 7° 39' 49.80" E |
Technical Information
Dimensions
total length | 16.16 m | |
span | 16.16 m | |
bridge surface | 616 m² | |
number of lanes | 2 x 3 | |
total width | 38.10 m |
Cost
cost of construction | Euro 5 600 000 |
Materials
superstructure |
precast reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
precast reinforced concrete |
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 8./9. März 2021, Dresden (Germany), pp. 92. (2021):
- About this
data sheet - Structure-ID
20079322 - Published on:
26/04/2020 - Last updated on:
10/06/2022