0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 11 October 2019
Completion: July 2020
Status: in use

Project Type

Location

Location: , , ,
Address: Unna; Afferder Weg
Part of:
Supports: A 1 Motorway (Germany)
Coordinates: 51° 33' 3.81" N    7° 39' 49.80" E
Show coordinates on a map

Technical Information

Dimensions

total length 16.16 m
span 16.16 m
bridge surface 616 m²
number of lanes 2 x 3
total width 38.10 m

Cost

cost of construction Euro 5 600 000

Materials

superstructure precast reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
precast reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2021): Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 8./9. März 2021, Dresden (Germany), pp. 92.
  • About this
    data sheet
  • Structure-ID
    20079322
  • Published on:
    26/04/2020
  • Last updated on:
    10/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine