0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Adventist Bolingbrook Hospital

General Information

Beginning of works: 2005
Completion: 2007
Status: in use

Project Type

Function / usage: Hospital

Location

Location: , , ,
Address: 500 Remington Boulevard
Coordinates: 41° 40' 51.53" N    88° 5' 3.98" W
Show coordinates on a map

Technical Information

Cost

cost of construction United States dollar 133 000 000

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20029542
  • Published on:
    30/07/2007
  • Last updated on:
    23/04/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine