0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Admiralty South Overrun Tunnel

General Information

Beginning of works: 2015
Completion: 2020
Status: under construction

Project Type

Construction method: Drilling and blasting
Structure: Tunnel
Function / usage: Metro tunnel / subway tunnel

Location

Location: , ,
Part of:
Connects to: Admiralty MTR Station (1980)
Coordinates: 22° 16' 43.43" N    114° 9' 50.16" E
Show coordinates on a map

Technical Information

Cost

cost of construction Hong Kong dollar 412 138 888

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070957
  • Published on:
    10/03/2016
  • Last updated on:
    10/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine