0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Galleria Adige-Garda
Other name(s): Mori-Torbole Tunnel
Beginning of works: 1 March 1939
Completion: 18 May 1959
Status: in use

Project Type

Structure: Tunnel
Function / usage: Water supply tunnel

Location

Location: , , ,
, , ,
Coordinates: 45° 51' 39.89" N    10° 52' 34.40" E
Coordinates: 45° 52' 0.22" N    11° 0' 6.31" E
Show coordinates on a map

Technical Information

Dimensions

diameter 8 m
length 9 873 m
slope of channel 0.8688%
water flow 500 mc

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088778
  • Published on:
    30/06/2024
  • Last updated on:
    30/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine