General Information
Name in local language: | Galleria Adige-Garda |
---|---|
Other name(s): | Mori-Torbole Tunnel |
Beginning of works: | 1 March 1939 |
Completion: | 18 May 1959 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Water supply tunnel |
Location
Location: |
Mori, Trento, Trentino-South Tyrol, Italy Nago-Torbole, Trento, Trentino-South Tyrol, Italy |
---|---|
Coordinates: | 45° 51' 39.89" N 10° 52' 34.40" E |
Coordinates: | 45° 52' 0.22" N 11° 0' 6.31" E |
Technical Information
Dimensions
diameter | 8 m | |
length | 9 873 m | |
slope of channel | 0.8688% | |
water flow | 500 mc |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20088778 - Published on:
30/06/2024 - Last updated on:
30/06/2024