General Information
Name in local language: | Ackermann-Brücken |
---|---|
Completion: | 9 July 2018 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Augsburg, Bavaria, Germany |
---|---|
Address: | Bürgermeister-Ackermann-Straße |
Crosses: |
|
Coordinates: | 48° 22' 13.74" N 10° 52' 36.17" E |
Technical Information
Cost
cost of construction | Euro 16 900 000 |
Case Studies and Applied Products
Temporary bridge for Ackermann Bridge Project in Augsburg
At 40,000 vehicles per day, the 50 year old Ackermann Bridge that crosses the Wertach River in Augsburg, Germany is one of the most heavily travelled bridges in the city. The structure was badly deteriorated and is therefore being replac ... [more]
Participants
Owner
Structural engineering
Co-contractor
Material supplier
Temporary works
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20076729 - Published on:
04/02/2019 - Last updated on:
03/02/2020