General Information

Name in local language: Puente de Abbas Ibn Firnás
Beginning of works: May 2005
Completion: 14 January 2011
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Guadalquivir River
Coordinates: 37° 50' 50" N    4° 48' 17" W
Show coordinates on a map

Technical Information

Dimensions

main spans (2x) 132.50 m
deck width 30.40 m
number of lanes 2 x 3
piles diameter 1.500 m
approach viaduct
span lengths 25.00 m - 2 x 37.50 m
number of spans 3

Quantities

structural steel 4 000 t
concrete volume 10 000 m³
reinforcing steel 1 500 t
piles total length of piles 1 900 m

Cost

cost of construction (incl. taxes) Euro 17 785 272.28

Materials

superstructure composite steel-reinforced concrete
piers reinforced concrete
arches concrete-filled steel section
abutments reinforced concrete

Participants

Design
Detailed design
Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20063324
  • Published on:
    19/07/2012
  • Last updated on:
    16/06/2021