0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Aarebrücke Aarburg
Beginning of works: 1911
Completion: 1912
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Aare River
Coordinates: 47° 19' 13.02" N    7° 53' 52.91" E
Show coordinates on a map

Technical Information

Dimensions

total length 71.92 m
rise:span 1:9.76
span 67.83 m
total width 9.50 m
arch rise 6.95 m
deck number of longitudinal girders 4

Cost

cost of construction Swiss Franc 100 000

Materials

deck reinforced concrete
arch reinforced concrete
piers on arch reinforced concrete

Chronology

1969

Due to severe deterioration of the piers on the arch supporting the original deck, the vertical supports and the deck are removed and replaced by a prestressed concrete deck. Since then the bridge has an overall appearance more like the later three-hinged arch bridges of Robert Maillart.

2022 The bridge is strengthened with a layer of UHPC. The abutment walls are monolithically connected with the bridge deck. Therefore, concrete hinges needed to be introduced in the abutment walls by horizontal cuttings. The project was a BIM-to-Field pilot project carried out by Equi Bridges Ltd.

Participants

Initial construction (1911-1912)
Owner
Design
Construction
Strengthening (2020-2022)
Owner
Client
Design
Software

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005406
  • Published on:
    23/09/2002
  • Last updated on:
    21/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine