General Information

Beginning of works: 2009
Completion: 8 July 2010
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 52° 34' 21.71" N    13° 13' 16.30" E
Show coordinates on a map

Technical Information

Dimensions

total length 156.50 m
vertical navigation clearance 4.50 m
horizontal navigation clearance 14.00 m
main bridge
total length 67.59 m
deck width 3.00 m
pylon height 24.00 m
north ramp
total length 61.19 m
south ramp
total length 28.50 m

Quantities

structural steel 89 t

Cost

cost of construction (incl. taxes) Euro 1 797 000

Materials

pylon steel
deck of main bridge steel

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20066106
  • Published on:
    20/04/2014
  • Last updated on:
    26/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine