General Information
Project Type
Structure: |
Cable-stayed bridge with fan system |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Berlin-Hakenfelde, Spandau, Berlin, Germany |
---|---|
Coordinates: | 52° 34' 21.71" N 13° 13' 16.30" E |
Technical Information
Dimensions
total length | 156.50 m | |
vertical navigation clearance | 4.50 m | |
horizontal navigation clearance | 14.00 m | |
main bridge | ||
---|---|---|
total length | 67.59 m | |
deck | width | 3.00 m |
pylon | height | 24.00 m |
north ramp | ||
total length | 61.19 m | |
south ramp | ||
total length | 28.50 m |
Quantities
structural steel | 89 t |
Cost
cost of construction (incl. taxes) | Euro 1 797 000 |
Materials
pylon |
steel
|
---|---|
deck of main bridge |
steel
|
Participants
Client
Checking engineering
-
Klähne Beratende Ingenieure im Bauwesen GmbH
- Thomas Klähne (checking engineer)
Co-contractor
Relevant Web Sites
- About this
data sheet - Structure-ID
20066106 - Published on:
20/04/2014 - Last updated on:
26/09/2024