General Information
Completion: | Spring 2015 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Box girder bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Arrochar, Argyll and Bute, Scotland, United Kingdom |
---|---|
Address: | A82 |
Coordinates: | 56° 17' 8.27" N 4° 42' 16.32" W |
Technical Information
Dimensions
total length | 168 m | |
span lengths | 24 m - 4 x 30 m - 24 m | |
number of spans | 6 |
Cost
cost of construction | Pound sterling 9 200 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
wall |
reinforced concrete
|
main girders |
steel
|
Participants
Owner
Design
Technical advisor to the owner
Checking engineering
Contractor
Steel erection
Special foundations
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2016): The A82 Pulpit Rock Improvements – A Complex Propped Cantilever Viaduct. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2375-2382.
- About this
data sheet - Structure-ID
20072115 - Published on:
08/11/2016 - Last updated on:
25/11/2016