General Information
Completion: | 1997 |
---|---|
Status: | in use |
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Structure: |
Single-cell box girder bridge Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Almaraz, Cáceres, Extremadura, Spain |
---|---|
Crosses: |
|
Coordinates: | 39° 46' 46.26" N 5° 43' 58.39" W |
Technical Information
Dimensions
total length | 469 m | |
span lengths | 50 m - 65 m - 90 m - 175 m - 89 m | |
number of spans | 5 | |
abutments | height | ca. 8 m |
deck | deck depth | 3.25 - 8.75 m |
deck width | 10.5 m | |
piers | height | max. 35 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- El puente sobre el río Tajo, en la autovía de Extremadura. In: Hormigón y acero, v. 49, n. 207 (1st Quarter 1998), pp. 47-57. (1998):
- About this
data sheet - Structure-ID
20076290 - Published on:
03/11/2018 - Last updated on:
03/11/2018