General Information
Official designation: | BW 50.1 |
---|---|
Beginning of works: | 2005 |
Completion: | 2006 |
Duration of works: | 18 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Network arch bridge |
Material: |
Steel bridge |
Structure: |
Unbraced tied-arch bridge |
Awards and Distinctions
2008 |
entry
for registered users |
---|
Location
Location: |
Markkleeberg, Leipzig (Kreis), Saxony, Germany |
---|---|
Address: | B 2 |
Crosses: |
|
Part of: | |
Coordinates: | 51° 14' 53.79" N 12° 23' 32.81" E |
Technical Information
Dimensions
span | 87.92 m | |
bridge surface | 4 809 m² | |
arch | rise | ca. 15 m |
deck | deck width | 2 x 25.50 m |
roadway / carriageway width | 2 x 11.50 m |
Quantities
structural steel | 1 621 t |
Cost
cost of construction | Euro 7 500 000 |
Materials
arches |
steel
|
---|
Participants
Owner
Client
Original design
Alternative design
Structural engineering
Geotechnical/geological experts
Checking engineering
- Mildner (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken im Zuge der A38. Presented at: , pp. 283-296. (2004):
- Brücken und Tunnel der Bundesfernstraßen 2006. Deutscher Bundes-Verlag, Cologne (Germany), 2006, pp. 91-105.
- About this
data sheet - Structure-ID
20034786 - Published on:
29/02/2008 - Last updated on:
05/02/2016