General Information
| Official designation: | BW 50.1 |
|---|---|
| Beginning of works: | 2005 |
| Completion: | 2006 |
| Duration of works: | 18 months |
| Status: | in use |
Project Type
| Structure: |
Network arch bridge Unbraced tied-arch bridge |
|---|---|
| Function / usage: |
Road bridge |
| Material: |
Steel bridge |
Awards and Distinctions
| 2008 |
entry
for registered users |
|---|
Location
| Location: |
Markkleeberg, Leipzig (Kreis), Saxony, Germany |
|---|---|
| Address: | B 2 |
| Crosses: |
|
| Part of: | |
| Coordinates: | 51° 14' 53.79" N 12° 23' 32.81" E |
Technical Information
Dimensions
| span | 87.92 m | |
| bridge surface | 4 809 m² | |
| arch | rise | ca. 15 m |
| deck | deck width | 2 x 25.50 m |
| roadway / carriageway width | 2 x 11.50 m |
Quantities
| structural steel | 1 621 t |
Cost
| cost of construction | Euro 7 500 000 |
Materials
| arches |
steel
|
|---|
Participants
Owner
Client
Original design
Alternative design
Structural engineering
Geotechnical/geological experts
Checking engineering
- Mildner (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2004): Brücken im Zuge der A38. Presented at: , pp. 283-296.
- Brücken und Tunnel der Bundesfernstraßen 2006. Deutscher Bundes-Verlag, Cologne (Germany), 2006, pp. 91-105.
- About this
data sheet - Structure-ID
20034786 - Published on:
29/02/2008 - Last updated on:
05/02/2016


