0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Egypetskiy most
Beginning of works: 1825
Completion: 1826
Status: destroyed (1905)

Project Type

Structure: Suspension bridge
Function / usage: Road bridge

Location

Location: , ,
Crossed:
  • Fontanka River

Technical Information

Dimensions

main span 54.86 m
sag 5.49 m
sag:span 1:10
deck deck width 10.68 m

Chronology

20 January 1905

A cavalry regiment passes the bridge. One suspension cable breaks and the bridge collapses. Among the 60 people propelled into the river none have fatal injuries, although several horses perish.

1908

The remains of the bridge are dismantled.

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005717
  • Published on:
    01/10/2002
  • Last updated on:
    24/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine