Biographical Information
Name: | Michel Marchetti |
---|---|
Born in | 1950 |
Place(s) of activity: |
Bibliography
- Adjustment of the Rion-Antirion Cable-Stayed Bridge. An Innovative Multidisciplinary Response to a Construction Challenge. Presented at: 1st FIG International Symposium on Engineering Surveys for Construction Works and Structural Engineering, The University of Nottingham, United Kingdom, 28 June - 1 July 2004. (2004):
- La construction du pont en arc de Trellins sur l'Isère. In: Travaux, n. 639 (January 1989), pp. 43-57. (1989):
- Le nouveau pont sur l'Elorn à Brest. In: Travaux, n. 699 (June 1994), pp. 48-60. (1994):
- Elorn Bridge. Stay and geometry adjustment. Presented at: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994, pp. 363. (1994):
- Le pont du roi Taskin à Bangkok (Thaïlande). In: Travaux, n. 582 (November 1983), pp. 37-43. (1983):
- About this
data sheet - Person-ID
1002968 - Published on:
11/10/2003 - Last updated on:
22/07/2014