0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Biographical Information

Name: Ilya Husty
Place(s) of activity:

Structures and Projects

Participation in the following structures & large-scale projects:

Bibliography

  1. Stráský, Jiří / Husty, Ilja (1997): Arch bridge crossing the Brno-Vienna expressway. Presented at: International Conference: Composite Construction - Conventional and Innovative, Innsbruck, Austria, 16-18 September 1997.

    https://doi.org/10.5169/seals-1089

  2. Stráský, J. / Husty, I. / Kolcava, S. (1990): Die Spannbeton-Schrägseilbrücke über die Elbe bei Podebrady, Tschechoslowakei. In: Beton- und Stahlbetonbau, v. 85, n. 1 (January 1990), pp. 18-22, 45-51.

    https://doi.org/10.1002/best.199000060

  3. Stráský, Jiří / Husty, Ilja / Juttner, Vilem (2004): Composite bridges built in the area influenced by a mining subsidance. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 65-66.
  4. Stráský, Jiří / Husty, Ilja (1999): Arch bridge crossing the Brno-Vienna expressway. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 132, n. 4 (November 1999), pp. 156-165.

    https://doi.org/10.1680/icien.1999.31918

  • About this
    data sheet
  • Person-ID
    1001716
  • Published on:
    23/06/2002
  • Last updated on:
    22/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine