Biographical Information
Name: | Hans-Joachim Bargstädt |
---|
Bibliography
- (2021): Automated framework for optimized path-planning for pile foundation drilling machines based on 4D BIM modelling. Presented at: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, pp. 1949-1956.
- (2021): A BIM-integrated graph database for the construction execution phase. Presented at: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, pp. 903-911.
- (2019): Automated data acquisition to show the actual performance during the construction process. Presented at: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, pp. 1565-1572.
- 4D Relationships: The Missing Link in 4D Scheduling. In: Journal of Construction Engineering and Management, v. 142, n. 2 (February 2016), pp. 04015072. (2016):
- Beanspruchungsabhängige Steifigkeiten dicker Stahlbetonrahmen. In: Bautechnik, v. 66, n. 10 (October 1989), pp. 337-342. (1989):
- About this
data sheet - Person-ID
1011076 - Published on:
06/10/2018 - Last updated on:
06/10/2018