Media File No. 73395
Contractors are finishing the 4.70 m high standard floors for the two cores of the Torre Repsol in weekly cycles as planned. From the supporting frame for the placing boom up to the lowest suspended finishing platform for the special steel fittings, the ACS unit has an overall height of 25 metres in the area of the elevator shafts
|
More media of this structure |