Media File No. 69568
Advanced Enerpac hydraulics takes care of the safe and controlled opening and closing of the Nantong Stadium's roof. In this photograph, it is depicted during the testing phase in the opened position. It takes 20 to 30 minutes to open the roof
|
More media of this structure |