Media File No. 56104
Along with the assembly progress of the roof construction, the PERI UP scaffold grew in size accordingly. Installation of the titanium roof skin took place in reverse order from the top downwards. After completion of each upper section, the height of the scaffolding was immediately reduced for the next working level
|
More media of this structure |