Media File No. 53449
The tunnel cross-section was constructed semi-monolithically using a cut-and-cover method – the walls and slab being concreted in one pour. The Weissenhorn-based formwork and scaffolding manufacturer, PERI, provided a very convincing concept
|
More media of this structure |