0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Media File No. 53449

The tunnel cross-section was constructed semi-monolithically using a cut-and-cover method – the walls and slab being concreted in one pour. The Weissenhorn-based formwork and scaffolding manufacturer, PERI, provided a very convincing concept

Media-ID: 53449
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 20/01/2006

More media of this structure

Germany (2009)