Filstalbrücke
Construction of the Filstal bridge. The picture shows the moveable scaffold system for the construction of long bridges of prestressed concrete. The bridge under construction will be a 485 m long railway overpass at the new line Wendlingen - Ulm.
|
More media of this structure |