0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mersey Gateway Bridge - South Pylon Second Lift - September 2015

A timelapse of the preparation and concrete pour for the second vertical section of the 125m south pylon

Media-ID: 369692
Created in/on: 10 September 2015
Author/Source:
YouTube
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Last updated on: 12/01/2022

More media of this structure

United Kingdom (2017)