Installation of the bridge's first pier cap - July 2017
The first pier caps of the New Champlain Bridge are installed This summer, the team of the cable stay bridge reached another milestone installing the first pier cap of the project. The pier caps are colossal, W-shaped lateral steel girders on which the three traffic corridors will rest. Until now, eight pier caps are visible from the axe of the future bridge and the installation will go on for several months. Watch the timelapse of the operations of lifting and installation for this first pier caps.
|
More media of this structure |