Connecting the Shorelines - Engineering and Drafting - New Champlain Bridge (videoclip 1)
Discover the engineering and design challenges for the fabrication of the new Champlain Bridge components. The New Champlain Bridge for Canam, it is: -44,000 tons of steel -601 box girders -2.8 km of structure to realize -500 workers
|
More media of this structure |