John Greenleaf Whittier Bridge
Construction of the new northbound span of the Whittier Bridge continues, as the concrete deck panels are installed and the hanger cables are prepped for stressing. In-water construction continues below the deck on the new and existing Whittier Bridge piers.
|
More media of this structure |