0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Terfener Innbrücke constructed using the balanced cantilever method

The project was carried out using the balanced cantilever construction method. The system components of the VARIOKIT Engineering Construction Kit provided the basis.

Media-ID: 344410
Author/Source:

Günther Bayerl

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 17/07/2020

More media of this structure

More media for this product/service available at: