FCC`s teamwork in the Danube Vidin-Calafat`s bridge
During the last 6 years, the FCC professional team with consolidated experience in the construction of large works throughout the entire world, has worked to make Vidin- Calafat`s bridge,Bulgay-Romania, a reality. This is the biggest Bulgarian project, a combined bridge, with a total length of 1,791 metres for vehicular and railway traffic. There are four roadway lanes, single-track electrified railway track, a bicycle lane, two pedestrian pavements and service lane, all on a single deck.
|
More media of this structure |