0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Using 75 m² units, the tank walls as well as all the walls of the pumping station and the concrete casing of the pipelines were formed.

Media-ID: 323545
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 25/06/2019

More media for this product/service available at: