Media File No. 31935
Platform construction at a height of almost 28 m with access possibilities up to the lantern high in the dome. The scaffold tower (shown here in grey) had only a support function for the suspended working platform and was immediately dismantled afterwards. Ground plan of the working platform with GT 24 girders arranged in a star-shape. PERI UP Rosett and LGS beams as shoring or sub-structure
|
More media of this structure |