For realizing the Moselle Lock in Trier, around 45,000 m³ of concrete was processed during the construction period of almost 1.5 years.
For realizing the Moselle Lock in Trier, around 45,000 m³ of concrete was processed during the construction period of almost 1.5 years.
|