Chadstone Shopping Centre
PERI Australia supplied a comprehensive planning solution for the up to 20 m high load-bearing shoring and working scaffold up to 85 m long. Thanks to the lightweight system components, the scaffolding could be erected and dismantled without a crane
|
More media of this structureMore media for this product/service available at:Other similar media files |