Media File No. 272824
Part of the PERI climbing concept was the utilization of MP Landing Platforms for moving and intermediate storage of formwork materials. The cantilevered RCS Rails were simply clamped by means of MULTIPROP props between two floor slabs.
|
More media of this structureMore media for this product/service available at: |